一区二区三区在线播放-91在线精品视频-久久久精彩视频-少妇按摩一区二区三区-久草久-亚洲精品久久久久avwww潮水-av噜噜-日本黄色高清-大香焦久久-日韩人体视频-手机在线亚洲-天天透天天操-无法忍受在线观看-911美女片黄在线观看游戏-国产xxxxxxxxx-波多野结衣黄色网址-国产视频aaa-少妇熟女一区二区三区-日本免费色-神马电影久久

Project News

ProjectNews

Home > ABOUT US > Media Events > Project News

Indonesia CNI RKEF FeNi Project Produced First Batch of FeNi
DATE:30 Apr 2025 瀏覽次數:1
+ . -
On April 27, the ?CNI RKEF Ferronickel Project (Phase I)? in Indonesia, an EPC contract by China ENFI, successfully produced its first batch of ferronickel, marking its official entry into the trial production phase.

Located in Southeast Sulawesi Province, Indonesia, the CNI project is the country’s first industrial project invested by a local Indonesian owner and contracted to China ENFI on an EPC basis. The project employs advanced RKEF process and is equipped with China ENFI’s patented 72MVA rectangular electric furnace (the largest of its type in Indonesia) and hot calcine transfer system, to produce ferronickel with a 22% Ni grade. Each production line is designed to produce approximately 125,000t/a of nickel equivalent ferronickel products, positioning the project as a ?new benchmark in Indonesia’s ferronickel smelting industry? upon commissioning.


With the ?successful energization of the electric furnace on April 6, ?the slag tapping on April 18, and the ferronickel production on April 27, the project has set a record in the industry for ?large-scale rectangular ferronickel electric furnaces by completing the entire process from furnace energization to ferronickel output in just 21 days?.